Gold Member Since 2017
Audited Supplier
Changzhou Bonade Heat Treatment System Co., Ltd.

Furnace, Resistance Furnace, Electric Furnace manufacturer / supplier in China, offering 480kw Bogie Hearth Quenching Furnace for Heat Treatment, 300kw Air Circulation Bogie Hearth Furnaces for Heat Treatment, 60kw Pit-Type Resistance Furnace for Heat Treatment and so on.

(/ )

Supplier Homepage Product Trolley furnace 480kw Bogie Hearth Quenching Furnace for Heat Treatment

480kw Bogie Hearth Quenching Furnace for Heat Treatment

FOB Price: US $5,500-6,500 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $5,500-6,500/ Piece
Get Latest Price
Production Capacity: 100 Units / Year
Transport Package: Plastic Film Protection
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: RT2-480-12
  • Place Style: Horizontal
  • Type: Heat Treatment Furnace
  • Fuel: Electrical or Gas
  • Operating Temperature: 850-1150ºC
  • Rated Voltage: 380V
  • Empty Furnace Heating Time: 2.5h
  • Furnace Temperature Uniformity: ±7.5
  • Weight: 15000kg
  • Specification: 3500mm× 1350mm× 950mm
  • HS Code: 8514101000
  • Certification: CE, ISO
  • Range of Applications: Industrial
  • Usage: Quenching
  • Paint: High Temperature Silver Paint
  • Maximum Temperature: 1200ºC
  • Heating Element Connection Method: Yy
  • Temperature Control Accuracy: ±1
  • Maximum Load Capacity: 12000kg
  • Trademark: bonade
  • Origin: Changzhou
Product Description
480kw Bogie Hearth Quenching Furnace for Heat Treatment

Bogie Hearth Quenching Furnace is mainly used for:
High chromium, high manganese steel castings, ductile iron, roll, steel ball, 45 steel, stainless steel and so on
480kw Bogie Hearth Quenching Furnace for Heat Treatment
parameter nameunittype
RT2-65-12RT2-80-12RT2-125-12RT2-220-12RT2-380-12RT2-480-12RT2-600-12RT2-900-12
rated powerKW6580125220380480600900
Rated voltageV380
Maximum temperatureºC1200
Operating temperatureºC850-1150
sizeLmm12001500180021003000350040006000
Wmm60055090010501350135015002500
Hmm4004506007509509509501200
Heating element connection method YY
Empty furnace heating timeh2.52.52.53.53.5444.5
Temperature control accuracyºC±1
Furnace temperature uniformityºC±7.5
Maximum load capacityKg6001000250040008000120001800028000
weightKg150030005000800010000150001800022000
 
can design and manufacture for the user a variety of furnace size, different specifications 
Precautions:
           

1, the operator must be aware of the maintenance of the following before the car furnace:
A, electric furnace and its auxiliary equipment structure and performance.
B, distribution system, the layout of the control system and the location of the safety device.
C, operating procedures and safe operating procedures.


2, ready to check:
A, check the equipment power supply is normal, whether there is phase, short circuit or bare line and so on.
B, check the grounding device wiring contact is good.
C, check whether the heating element is damaged, the contact at the connection is good, whether it is in contact with the furnace and the shell.
D, check the temperature control system is abnormal phenomenon.
E, check the door lift, trolley running out of normal.

3, with corrosive, volatile, explosive gas is strictly prohibited into the workpiece processing, so as not to affect the heating element and refractory life and cause an explosion and other accidents.
4, electric furnace shall not be over-temperature operation, otherwise it will shorten the service life of the equipment.
5, too much of the scale of the workpiece into the furnace before the need to clear the brush can be used under the wire.
6, the workpiece evenly stacked, from the heating element should be around 100-150mm.
7, is strictly prohibited barbaric operation, the workpiece should be light to avoid the impact.
8, electric stove when the operator is not allowed to leave the post, you must always pay attention to the work of the furnace is normal.
9, electric furnace in the loading and unloading of the workpiece, you must first cut off the heating element power supply to ensure the safety of the operator.
10, the furnace of the oxide (including electric furnace wire) should be cleaned up, at least once a week or five times a time. Under the bottom of the furnace can be compressed air blowing.
11, the resistance wire, such as after use, you can not hit the bend, so as not to break.
12, Note:

A, electric furnace motor to be regularly checked, add lubricants, etc., pay attention to the use of safety.
B, the drive shaft must always check the addition of lubricants to prevent damage to the shaft due to lack of oil.
C, regularly check the use of heating components.
D, regularly check the instrument, the use of thermocouple to prevent the instrument, thermocouple error caused by incorrect temperature measurement.
Send your message to this supplier
Avatar
Mr. Yao Zhou
General Manager
*From:
To: Mr. Yao Zhou
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now